Dazhi Road: from approved drawings to BIM and quantity take-offs

Dazhi Road is our own new building in Yancheng, Kaohsiung. The risks in building for yourself are miscounted quantities, quotes you can't read, and contracts and site records scattered everywhere. We turned the approved drawings into data we can compute — a BIM model, quantity tables and requests for quotation — then built our own tools for contracts, costs and site safety.

Client
Dazhi Road build (our own)
Practice
Construction Intelligence
Scope
DWG parsing · BIM modelling · take-offs · RFQs & negotiation · contract and site systems
Status
The BIM model turning through 360 degrees

The challenge挑戰

Building for yourself,
the numbers must be right.

  • Quantities drive cost

    Get steel, rebar, concrete or formwork quantities wrong and every quote is wrong with them.

  • Quotes don't line up

    Every contractor quotes in a different format, so they're hard to compare side by side.

  • Records must hold up

    Contracts, worker sign-ins and safety acknowledgements all need evidence you can find later.

What we built做法

How we built it

01

LOD 300 BIM model

Structure, walls, doors, windows and fittings are all modelled; floors can be pulled apart, foundations and ground-improvement piles inspected, and elements coloured by type.

02

Take-offs from DWG

We parse the 27 approved structural sheets directly into detailed tables for steel sections, plates, bolts, shear studs, stairs, deck, concrete, formwork and rebar.

03

RFQs & negotiation

Quantity tables become requests for quotation, and competing quotes become one comparison sheet with negotiation notes.

04

Contract management

A Google Apps Script contract system with a clause library, house templates, roles and version history.

05

Site sign-in & safety

Workers sign electronically with a selfie on arrival; the system records time, content and a digest so it holds up as evidence.

06

Cost tracking

Budget against spend at any moment, so you always know where the money went.

Results數字

Where it stands

LOD 300

BIM level of development

27

structural sheets parsed

9

take-off categories

3

in-house management tools

Built withStack

  • Python
  • LibreDWG
  • IFC4
  • three.js
  • Google Apps Script
  • Google Sheets

Construction Intelligence營建工程數位化

Want something
like this?

Start with a 30-minute call: we'll understand your situation, then propose the smallest useful version.